Merlin CRITICAL PATH 1998 VS Beyond Fabrications G2-AL INTEGRATED SUSPENSION 1996 specs comparison

🔥 Compare prices & customer reviews on Amazon
✔ Free shipping on many items • ✔ Easy returns • ✔ Trusted store
➜ Merlin Critical Path price ➜ Beyond Fabrications G2-Al Integrated Suspension price
Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price 🛒 View Price →     
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Beyond Fabrications G2-Al Integrated Suspension 1996 comparison online with competitors

Beyond Fabrications G2-Al Integrated Suspension

General Infos
Model G2-Al Integrated Suspension
Manufacturer Beyond Fabrications
Year of production 1996
Current price 🛒 View Price →     
Color choice -Brushed
Sizes - 16 (inches)
- 17.5 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire Rear: 26 X 1.90 (inches) Onza Rip Kevlar
Front: 26 X 1.90 (inches) Onza Rail Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano Deore XT Levers
Shimano Deore XT V-Brake Brakes
Hubs for disc brakesNot Available
Rims manufacturer 32-hole
Mavic M231
Spoke nipples typeAlloy Nipples
Spoke wheel 1.8 (millimeters) Double Butted
Wheelsmith XL-15 Stainless Steel

Frame and Body Specs

Frame materials7005 aluminum c
Frame typeWelded Aluminum
Handlebar constructionBontrager Titec 140g
Handlebar extenderOptional
Handlebar stem detailsControl Tech
Headset size1 1/8 (inches) Threadless Shimano Deore XT

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 113 (millimeters) Spindle
Shimano BB-UN72
Crankset parts and sizes 22/32/44 Teeth
Shimano Deore XT
Gear shift leversShimano Deore XT RapidFire SL
Rear gear set 11 - 28 Teeth
8-speed Titanium

Beyond Fabrications G2-Al Integrated Suspension Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 31.8 (millimeters)
Shimano Deore XT
Derailleur (Rear)Shimano Deore XT GS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Judy XC

Other Specs of Beyond Fabrications G2-Al Integrated Suspension

Component group setsShimano Deore XT
Pedals detailsOptional
Rear shock absorber 3.0 (inches) Travel
Risse
Saddle seatTitec Berzerkr Ti
Seat post extension 27.2 (millimeters) Diameter
Titec AL-235


Useful links and guides ....