Merlin CRITICAL PATH 1998 VS Ellsworth TRUTH ALUMINUM FS 1996 specs comparison
🔥 Compare prices & customer reviews on Amazon
✔ Free shipping on many items • ✔ Easy returns • ✔ Trusted store
➜ Merlin Critical Path price
➜ Ellsworth Truth Aluminum FS price
Merlin Critical Path
General Infos| Model | Critical Path |
| Manufacturer | Merlin |
| Year of production | 1998 |
| Current price | 🛒 View Price → |
| Color choice | -Brushed |
| Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
| Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
Wheels And Breaking System
| Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
| Bike rear tire | Not Available |
| Bike wheel size | 26 (inches) Wheels |
| Brakeset type | Shimano XTR LeversShimano XTR V-Brake Brakes |
| Hubs for disc brakes | Shimano XTR |
| Rims manufacturer | 32-holeMavic 217 SUP |
| Spoke nipples type | Alloy Nipples |
| Spoke wheel | 2.0 (millimeters) Double-buttedWheelsmith Stainless Steel |
Frame and Body Specs
| Frame materials | 3Al and 2.5V Titanium |
| Frame type | TIG-welded |
| Handlebar construction | Syncros Hardcore |
| Handlebar extender | Optional |
| Handlebar stem details | Syncros Hardcore |
| Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
| Bicycle chain | 1/2 X 3/32 (inches)Shimano CN-IG90 |
| Bottom bracket shell width | 68 (millimeters) English |
| Bottom bracket type | 112.5 (millimeters) SpindleShimano BB-M950 |
| Crankset parts and sizes | 24/34/46 TeethShimano XTR M950 |
| Gear shift levers | Shimano XTR RapidFire SL |
| Rear gear set | 11 - 34 Teeth8-speed |
Merlin Critical Path Fork System Data
| Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters)Shimano XTR |
| Derailleur (Rear) | Shimano XTR SGS |
| Fork material | Triple-clamp CrownAluminum and magnesium |
| Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
| Component group sets | Shimano XTR |
| Pedals details | Optional |
| Rear shock absorber | 3.5 (inches) TravelRock Shox Super Deluxe |
| Saddle seat | Bontrager With Titanium Rails |
| Seat post extension | 27.2 (millimeters) DiameterSyncros Hardcore Aluminum |
Ellsworth Truth Aluminum FS
General Infos| Model | Truth Aluminum FS |
| Manufacturer | Ellsworth |
| Year of production | 1996 |
| Current price | 🛒 View Price → |
| Color choice | - red anodized and black anodized- red powdercoat- white powdercoat- yellow powdercoat-Blue anodized and black anodized |
| Sizes | - 16 (inches)- 18 (inches)- 20 (inches) |
Wheels And Breaking System
| Bike front tire | 26 X 1.95 (inches) IRC Geo Claw Lite |
| Bike rear tire | Not Available |
| Bike wheel size | 26 (inches) Wheels |
| Brakeset type | Dia-Compe SS-5 Mark II LeversDia-Compe 987 Brakes |
| Hubs for disc brakes | Not Available |
| Rims manufacturer | Velocity K-525 |
| Spoke nipples type | Optional |
| Spoke wheel | Optional |
Frame and Body Specs
| Frame materials | Heat-treated6061 T6 Aluminum |
| Frame type | TIG-welded Aluminum |
| Handlebar construction | Battle Thermoplastic and Carbon |
| Handlebar extender | Optional |
| Handlebar stem details | Craig Metalcraft |
| Headset size | 1 1/8 (inches) Threadless Dia-Compe Kontak Aheadset AL |
Gearing Specifications
| Bicycle chain | 1/2 X 3/32 (inches)Sachs SCM55 |
| Bottom bracket shell width | 73 (millimeters) English |
| Bottom bracket type | 107 (millimeters) SpindleRace Face Turbine Sealed |
| Crankset parts and sizes | 24/34/46 TeethRace Face IB Compact |
| Gear shift levers | Grip Shift SRT-800 X-Ray |
| Rear gear set | 11 - 32 Teeth8-speed |
Ellsworth Truth Aluminum FS Fork System Data
| Derailleur (Front) | Top-pull and clamp-on 35.0 (millimeters)Shimano XTR |
| Derailleur (Rear) | Shimano Deore XT GS |
| Fork material | Triple-clamp CrownAluminum and magnesium |
| Fork type | Rock Shox Judy SL |
Other Specs of Ellsworth Truth Aluminum FS
| Component group sets | Shimano Deore XT |
| Pedals details | Optional |
| Rear shock absorber | 4.0 (inches) TravelFox Vanilla |
| Saddle seat | Titanium RailsSDG 2000 Kevlar |
| Seat post extension | 31.6 (millimeters) DiameterControl Tech Control Post |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Ellsworth Truth Aluminum FS manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Ellsworth Truth Aluminum FS Mountain bike here