Merlin CRITICAL PATH 1998 VS Norco SIX ONE 2007 specs comparison
🔥 Compare prices & customer reviews on Amazon
✔ Free shipping on many items • ✔ Easy returns • ✔ Trusted store
➜ Merlin Critical Path price
➜ Norco Six One price
Merlin Critical Path
General Infos| Model | Critical Path |
| Manufacturer | Merlin |
| Year of production | 1998 |
| Current price | 🛒 View Price → |
| Color choice | -Brushed |
| Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
| Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
Wheels And Breaking System
| Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
| Bike rear tire | Not Available |
| Bike wheel size | 26 (inches) Wheels |
| Brakeset type | Shimano XTR LeversShimano XTR V-Brake Brakes |
| Hubs for disc brakes | Shimano XTR |
| Rims manufacturer | 32-holeMavic 217 SUP |
| Spoke nipples type | Alloy Nipples |
| Spoke wheel | 2.0 (millimeters) Double-buttedWheelsmith Stainless Steel |
Frame and Body Specs
| Frame materials | 3Al and 2.5V Titanium |
| Frame type | TIG-welded |
| Handlebar construction | Syncros Hardcore |
| Handlebar extender | Optional |
| Handlebar stem details | Syncros Hardcore |
| Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
| Bicycle chain | 1/2 X 3/32 (inches)Shimano CN-IG90 |
| Bottom bracket shell width | 68 (millimeters) English |
| Bottom bracket type | 112.5 (millimeters) SpindleShimano BB-M950 |
| Crankset parts and sizes | 24/34/46 TeethShimano XTR M950 |
| Gear shift levers | Shimano XTR RapidFire SL |
| Rear gear set | 11 - 34 Teeth8-speed |
Merlin Critical Path Fork System Data
| Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters)Shimano XTR |
| Derailleur (Rear) | Shimano XTR SGS |
| Fork material | Triple-clamp CrownAluminum and magnesium |
| Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
| Component group sets | Shimano XTR |
| Pedals details | Optional |
| Rear shock absorber | 3.5 (inches) TravelRock Shox Super Deluxe |
| Saddle seat | Bontrager With Titanium Rails |
| Seat post extension | 27.2 (millimeters) DiameterSyncros Hardcore Aluminum |
Norco Six One
General Infos| Model | Six One |
| Manufacturer | Norco |
| Year of production | 2007 |
| Current price | 🛒 View Price → |
| Color choice | -Anodized Blue |
| Sizes | - Xsmall - small - medium - large - xlarge |
Wheels And Breaking System
| Bike front tire | 26 X 2.35 (inches) Kenda Nevegal |
| Bike rear tire | Not Available |
| Bike wheel size | 26 (inches) Wheels |
| Brakeset type | Avid Juicy 5 LeversAvid Juicy 5 HD With 7 (inches) Rotor Brakes |
| Hubs for disc brakes | Rear: Syncros Pro MountainFront: Syncros Factory 20 (millimeters) |
| Rims manufacturer | 32-holeSyncros DP 25 |
| Spoke nipples type | Not Available |
| Spoke wheel | 14ga. DT Swiss Champion Stainless Steel |
Frame and Body Specs
| Frame materials | Hydraformed Aluminum |
| Frame type | TIG-welded |
| Handlebar construction | Syncros Race Gain |
| Handlebar extender | Optional |
| Handlebar stem details | Syncros Race |
| Headset size | Ritchey Scuzzy Pro |
Gearing Specifications
| Bicycle chain | SRAM PC-971 |
| Bottom bracket shell width | Not Available |
| Bottom bracket type | Hollow Axle |
| Crankset parts and sizes | 24/36 TeethTruvativ Stylo GXP Carbon |
| Gear shift levers | SRAM X.9 Trigger |
| Rear gear set | 11 - 32 Teeth9-speed |
Norco Six One Fork System Data
| Derailleur (Front) | SRAM X.7 |
| Derailleur (Rear) | SRAM X.9 Med. Cage |
| Fork material | Single CrownAluminum and magnesium |
| Fork type | 120 - 160 (millimeters) Adjustable TravelMarzocchi All Mounatin SL 2 |
Other Specs of Norco Six One
| Component group sets | Mountain Mix |
| Pedals details | DMR V-8 |
| Rear shock absorber | 145 - 165 (millimeters) Adjustable TravelFox DHX 4.0 |
| Saddle seat | WTB Rocket V |
| Seat post extension | 30.0 (millimeters) DiameterTitec Scoper Telescopic |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Norco Six One manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Norco Six One Mountain bike here