Merlin CRITICAL PATH 1998 VS ProFlex 953 1993 specs comparison
🔥 Compare prices & customer reviews on Amazon
✔ Free shipping on many items • ✔ Easy returns • ✔ Trusted store
➜ Merlin Critical Path price
➜ ProFlex 953 price
Merlin Critical Path
General Infos| Model | Critical Path |
| Manufacturer | Merlin |
| Year of production | 1998 |
| Current price | 🛒 View Price → |
| Color choice | -Brushed |
| Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
| Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
Wheels And Breaking System
| Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
| Bike rear tire | Not Available |
| Bike wheel size | 26 (inches) Wheels |
| Brakeset type | Shimano XTR LeversShimano XTR V-Brake Brakes |
| Hubs for disc brakes | Shimano XTR |
| Rims manufacturer | 32-holeMavic 217 SUP |
| Spoke nipples type | Alloy Nipples |
| Spoke wheel | 2.0 (millimeters) Double-buttedWheelsmith Stainless Steel |
Frame and Body Specs
| Frame materials | 3Al and 2.5V Titanium |
| Frame type | TIG-welded |
| Handlebar construction | Syncros Hardcore |
| Handlebar extender | Optional |
| Handlebar stem details | Syncros Hardcore |
| Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
| Bicycle chain | 1/2 X 3/32 (inches)Shimano CN-IG90 |
| Bottom bracket shell width | 68 (millimeters) English |
| Bottom bracket type | 112.5 (millimeters) SpindleShimano BB-M950 |
| Crankset parts and sizes | 24/34/46 TeethShimano XTR M950 |
| Gear shift levers | Shimano XTR RapidFire SL |
| Rear gear set | 11 - 34 Teeth8-speed |
Merlin Critical Path Fork System Data
| Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters)Shimano XTR |
| Derailleur (Rear) | Shimano XTR SGS |
| Fork material | Triple-clamp CrownAluminum and magnesium |
| Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
| Component group sets | Shimano XTR |
| Pedals details | Optional |
| Rear shock absorber | 3.5 (inches) TravelRock Shox Super Deluxe |
| Saddle seat | Bontrager With Titanium Rails |
| Seat post extension | 27.2 (millimeters) DiameterSyncros Hardcore Aluminum |
ProFlex 953
General Infos| Model | 953 |
| Manufacturer | ProFlex |
| Year of production | 1993 |
| Current price | 🛒 View Price → |
| Color choice | -Not found |
| Sizes | - 14 - 16 - 18 - 20 |
Wheels And Breaking System
| Bike front tire | IRC Geoclaw Lite |
| Bike rear tire | Not Available |
| Bike wheel size | Not Available |
| Brakeset type | SS-5 Levers Brakes LeversDia-Compe 986 Cantilevers |
| Hubs for disc brakes | Rear: Shimano Deore LXFront: Ringle |
| Rims manufacturer | 32-holeMavic PSP-231 |
| Spoke nipples type | Not Available |
| Spoke wheel | Not Available |
Frame and Body Specs
| Frame materials | Alcoa 7005 Aluminum and chrome-moly |
| Frame type | Welded Aluminum |
| Handlebar construction | Accord A-6x560 (millimeters) |
| Handlebar extender | Not Available |
| Handlebar stem details | 18 (inches) 20 (inches)Girvin Vector 25.4x120/14 (inches) 135/16 (inches) |
| Headset size | Not Available |
Gearing Specifications
| Bicycle chain | Shimano CN-HG70 |
| Bottom bracket shell width | Not Available |
| Bottom bracket type | Not Available |
| Crankset parts and sizes | 26/36/46 TeethGirvin Power Drive Crankarms |
| Gear shift levers | Gripshift SRT-500 |
| Rear gear set | 12 - 28 Teeth7-speed |
ProFlex 953 Fork System Data
| Derailleur (Front) | Shimano Deore XT and 600 Ultegra |
| Derailleur (Rear) | Shimano Deore XT and 600 Ultegra |
| Fork material | Not Available |
| Fork type | Girvin Vector 2.2-inch Travel |
Other Specs of ProFlex 953
| Component group sets | Shimano and Girvin and Gripshift |
| Pedals details | Offroad |
| Rear shock absorber | Not Available |
| Saddle seat | Flite Titanium |
| Seat post extension | Accord S-2 |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your ProFlex 953 manual book version yo know further about this bike
- Saddles, tires And mechanical parts for ProFlex 953 Mountain bike here